πŸ‡ΊπŸ‡Έ #1 Sacramento, CA Pool Contractor
Free Estimate Available
Pinnacle Pools and Landscape
Pool under construction by Pinnacle Pools and Landscape
How We Build

Your Pool, Phase by Phase

Most homeowners have never built a pool before, and the not-knowing is the stressful part. Here is every stage of a Pinnacle project β€” what happens, roughly how long it takes, and what we need from you along the way.

CA License #892669
Licensed & fully insured
20+ Years Experience
Concrete & construction
Family Owned
Local, not a franchise
Free 3D Design
See it before we build it
Financing Available
Terms up to 20 years
  1. 01

    Free Consultation

    We come to your home, walk the yard, and talk through how you actually want to use the space.

    • On-site visit to measure the yard and check access, grade, setbacks, and utilities
    • Conversation about how you entertain, who swims, and what the backyard needs to do
    • Honest budget conversation β€” including what your number realistically buys
    • Review of financing options if you'd like to spread the investment out

    Your part: Share your wish list, your must-haves, and your budget range. The more direct you are, the better the first design lands.

  2. 02

    Custom 3D Design

    Your designer builds a photorealistic 3D model of the pool and backyard on your actual lot.

    • Full 3D rendering showing shape, depth, decking, features, and landscape together
    • Walk-through views so you can see the yard from the patio door and from the water
    • Unlimited revisions at this stage β€” moving a spa costs nothing on screen
    • Renderings double as HOA design-review exhibits where your community requires them

    Your part: Review the model and tell us what to change. This is the cheapest and easiest moment in the entire project to change your mind.

  3. 03

    Proposal & Agreement

    You receive a fixed, itemized proposal tied to the design you approved β€” no vague allowances.

    • Line-item pricing for excavation, structure, equipment, finishes, decking, and landscape
    • Clear scope of what is and isn't included, so there are no mid-build surprises
    • Payment schedule tied to construction milestones, not calendar dates
    • Financing paperwork completed here if you're using it

    Your part: Read the proposal carefully and ask every question you have. We'd rather spend an extra hour now than have a misunderstanding later.

  4. 04

    Engineering & Permits

    We produce engineered plans for your soil and grade, then take them through your city or county.

    • Structural engineering sized for your actual lot conditions, not a generic template
    • Permit application, plan check corrections, and fee handling on your behalf
    • Utility locating and coordination before anything is dug
    • HOA submission support where applicable

    Your part: Mostly waiting. Permit timelines vary by jurisdiction β€” we'll tell you where your application stands each week.

  5. 05

    Layout & Excavation

    The pool is chalked out on the ground, you approve the position, then we dig.

    • Layout painted on the dirt so you can stand in the shape before a shovel moves
    • Access route protected and staging area established
    • Excavation to the engineered depths and shaping of steps, benches, and ledges
    • Spoils hauled off and the site cleaned down

    Your part: Walk the layout with your project manager and confirm the placement. Keep pets and vehicles clear of the access route.

  6. 06

    Steel, Plumbing & Electrical

    The structural skeleton and every line that has to be buried before concrete goes in.

    • Reinforcing steel tied to the engineered spec throughout the shell
    • Plumbing rough-in for returns, skimmers, main drains, spa jets, and water features
    • Electrical rough-in and bonding grid for lighting, pumps, and automation
    • Pre-gunite inspection by the building department

    Your part: Nothing required β€” but this is a great week to walk the site and see how the plumbing maps to your design.

  7. 07

    Gunite Shell

    Concrete is pneumatically applied over the steel, forming the monolithic shell of your pool.

    • Gunite shot, carved, and hand-finished for shape, steps, and benches
    • Curing period during which the shell is watered daily to reach full strength
    • Equipment pad set and equipment plumbed
    • Shell inspected before finish work begins

    Your part: Water the shell daily during the cure if we ask β€” it materially improves the long-term strength of the concrete.

  8. 08

    Tile, Coping & Decking

    The pool starts looking like the rendering β€” waterline tile, coping, and deck.

    • Waterline tile and any raised-wall or spa tile set
    • Coping installed around the entire perimeter
    • Deck formed and poured β€” broom, stamped, pavers, or travertine per your selection
    • Drainage and deck expansion joints detailed to prevent future cracking

    Your part: Final material selections are confirmed before this phase starts, so bring any last questions to your designer early.

  9. 09

    Plaster, Fill & Startup

    Interior finish goes on, the pool is filled, and the water chemistry is dialed in.

    • Interior finish applied β€” plaster, quartz, or pebble depending on your selection
    • Immediate fill to protect the fresh finish from staining
    • Chemical startup over the following days to cure the surface correctly
    • Equipment commissioned, automation configured, and lighting tested

    Your part: Leave the fill hose running without interruption until the water reaches the tile line. Stay off the finish until we clear it.

  10. 10

    Landscape & Handoff

    Turf, planting, lighting, and fencing complete the yard β€” then we hand you the keys.

    • Landscape, turf, irrigation, and low-voltage lighting installed
    • Fencing and safety requirements completed to code
    • Full owner orientation on equipment, automation, and week-to-week care
    • Final walkthrough, punch list, and warranty documentation

    Your part: Walk the whole project with us and flag anything that isn't right. Nothing closes until you're satisfied.

Ready When You Are

Phase one starts with a conversation

There is no cost and no obligation to get a 3D design. Tell us about your yard and we'll show you what it could become.

Request Your Free Consultation

Tell us where you are and what you're planning. We'll call you back β€” usually the same day.

No obligation. Licensed & insured Β· CA Lic. #892669

Process Questions, Answered

How long does the whole pool building process take?

It depends on the scope of your project, your city's permitting process, and the weather. Design and proposal come first, then engineering and permitting, then construction, and finally landscape and finishing work. We give you a realistic schedule in writing once the design is set, and we keep you updated as each phase moves.

When do I have to make my final material selections?

Tile, coping, decking, and interior finish selections are locked in before the tile and decking phase begins β€” usually around the time excavation starts. Your designer walks you through samples so you're choosing from real materials, not a screen.

How are payments scheduled?

Payments are tied to construction milestones rather than calendar dates, so you pay for work that has actually been completed. The full schedule is spelled out in your proposal before you sign anything.

Will my yard be destroyed during construction?

There will be heavy equipment and an access route through part of your yard β€” that's unavoidable. We protect what we can, keep the site cleaned down between phases, and restore the access route as part of the landscape phase.

Who handles the permits and inspections?

We do. We prepare the engineered plans, submit the permit application, respond to plan-check corrections, and schedule every inspection. You never have to visit the building department.

Can I make changes once construction has started?

Small changes are often possible, but they get more expensive at every phase. That's exactly why we build the 3D model first β€” changing the design on screen is free, and changing a poured shell is not.

Still have questions about the build?

Talk to the person who would actually run your project β€” not a call center.

Call (916) 336-5711Text UsCA Lic. #892669
CallTextFree 3D Design